Scheduled maintenance · CNC Machine

MultiCam CNC

6 tasks on the schedule · 6 never logged

Way lube refill

Top off way lube reservoir; verify pump operation

every 1 weeks
Never logged

Monthly spindle inspection

Tool clamp, runout check, bearing temperature

every 1 months
Never logged

Coolant change and reservoir clean

Drain, clean, refill with fresh coolant at proper concentration

every 3 months
Never logged

Bridge / gantry alignment check

Verify squareness and parallelism

every 6 months
Never logged

Annual factory PM service

Park Industries health-check inspection: structural, fluids, calibration

every 1 years
Never logged

Filter change (coolant, way lube, air)

Manufacturer-specified filters

every 500 runtime hours
Never logged